Day 9 found Dave back at the house, which was the Friday after Thanksgiving. He and his "assistant", my husband, walked around the kitchen trying to find squeaky floor spots and eliminating the culprits. It was a pretty quick-to-do task, but those two chatted like girls and so the job took a bit longer.
Day 10- John, the tile guy, was here. He laid all the cement board.
Day 11- John cut all the tile.
Day 12- today- He and his (true) assistant will lay the tile.
Day 13 will finish the tile laying and Day 14 will be grout installation.